How we deliver
Seven phases. Each ends with a document the operator can check.
- Design. HLD and LLD. Sample table of contents.
- Build. Install and configure to the approved design.
- Integration. Connect to identity, billing, payment, ITSM, CMDB, NOC and SOC. Each interface has a signed interface control document.
- Migration. Move VMs, applications and databases. Each move has a plan, a test and a rollback step.
- Testing and acceptance. A written test plan, recorded results, signed evidence.
- Training and documentation. Engineer training and handover runbooks for daily work, upgrades and recovery.
- Warranty and long-term support. Under an agreed contract.