Seven phases. Each ends with a document the operator can check.

  1. Design. HLD and LLD. Sample table of contents.
  2. Build. Install and configure to the approved design.
  3. Integration. Connect to identity, billing, payment, ITSM, CMDB, NOC and SOC. Each interface has a signed interface control document.
  4. Migration. Move VMs, applications and databases. Each move has a plan, a test and a rollback step.
  5. Testing and acceptance. A written test plan, recorded results, signed evidence.
  6. Training and documentation. Engineer training and handover runbooks for daily work, upgrades and recovery.
  7. Warranty and long-term support. Under an agreed contract.
Build your telco cloud with TenaxDesign, build, integration and long-term support from one team.